Guizhou Copper Ore Crushing Line Project

Project Profile

The project is another metal mine mining project of a mining company in Guizhou, in order to deeply and reasonably develop and utilise the high-grade copper resources, a new 600T/H copper ore crushing project is specially built, which was constructed and put into production in 2019, with stable equipment production, up to the standard capacity, and a high degree of automation.

Design Scheme

  • PE Jaw Crusher

    PE Jaw Crusher

    Capacity: more

  • HST Hydraulic Cone Crusher

    HST Hydraulic Cone Crusher

    Capacity: more

Project Advantages

  • Coarse crushing

    PE1200×1500 jaw crusher

  • Medium crushing

    HST315S (S coarse type) single-cylinder hydraulic cone crusher

  • Fine crushing

    two HST315H (H fine type) single-cylinder hydraulic cone crusher

  • Screening

    3 sets of S5X3075-3T heavy duty vibrating screen

  • The production line adopts

    one coarse crushing + two ‘crushing + screening’ closed-circuit systems, with high automation, high equipment utilisation and stable production capacity.

Conclusion

The project since the construction and put into production, the equipment has been running well, for customer enterprises to increase production and efficiency, prompting the comprehensive strength of the enterprise, to win rich profits, won the praise of the customer.